Personnel Protection Tunnel System and Safety Inspection Cage for Cimsa Cimento Sanayii - Kayseri and Mersin Plant

Bricking Solutions Personnel Protection Tunnel System provides a safe environment for workers from falling coating and brick inside your kiln.

The tunnel is designed to protect coating up to 113 kg (250 lb) from 455mm (18 in) with a 3:1 safety factor

Fabricated from 6061 T6 Aluminum with a steel mesh cover. On request, un-assembled can fit through most openings. Each tunnel section is 5 ft (1.5m) long and can be connected together as long or as short as needed




For 5.5m & larger kilns, a collapsible carrier is optional to attach to forklift for transportation and installation assistance
 Each leg height can be adjusted in accordance with varying surfaces and thicknesses of a coated kiln

 The setup cage is the first cage assembled in the tunnel system. A castor on the setup cage rolls on top of the v-channel of a extension cage in preparation to assemble the next extension cage.











For manual installation >5.5m kiln, the larger Set up Cage is 8 ft (3M) long & rolls along the spine of the tunnel allowing each tunnel section to be set up under cover. The first cage in the tunnel system is the 5 ft (1.5M) long Inspection Cage. Which can also be used free standing as a portable safety cage for quick inspections and repairs.


Here at Bricking Solutions, we are always striving to advance our equipment for better efficiency and safety. We rigorously test our equipment to improve our designs.


or contact us or visit our website for more information

360.794.1277  info@brickingsolutions.com
www.brickingsolutions.com

Monday, April 8, 2013

Kiln Access Ramp for Lafarge Algeria - Ciment Blanc Algerien

Access into your kiln is one of the most crucial aspects of an outage. Having the right solution to bridge that gap is also very important. Bricking Solutions has been designing and manufacturing Kiln Access Ramps for over 20 years!


Ramps get personnel and equipment in and out of kiln safely.

Each ramp is custom designed by certified professional engineers, made with high grade 6061 T6 aircraft aluminum, strong as steel and half the weight.

The final drawings are submitted for approval by the customer.

Lightweight T6 aircraft aluminum construction is easy to handle and install. 3/8” (9mm) non-skid diamond plate decking.

Guard rails are removable. Radiused nose matches kiln.

Designed to support 15,000lbs (6,804kg) live load with a 3:1 safety factor.

 Matching personnel ramps available.

Lifting lugs are designed into every ramp to maximize use of forklift for installation.

Assembly is easy with modular sections.

Most ramps install in about an hour.

When the bridge section exceeds 20 feet (6M) and a standard forklift is insufficient as the only mean of support for installing it safely across the cooler breach, a load fixture is needed.

The Load Fixture is a frame with vertically adjustable horizontal support beams used to support the bridge section by means of cables while it is being extended across the cooler chamber.


 The Load Fixture is then used to lower the bridge section onto the kiln lip with the cable hoist.

All Bricking Solutions ramps are designed for working demolition equipment but special Brokk Matting should be used to prevent excessive wear to the ramp.

Brokk Matting is designed specific for each Brokk model and allows extra support on the ramp while demotion is being done.

Thank you ATC btp Industrie and Lafarge Algeria!

Do you want to see more photos? CLICK HERE

CLICK HERE for a short video